Notice of Construction - Archie Duckworth Bridge Rehabilitation

The County of Simcoe hereby advises and notifies all affected parties of the Rehabilitation of the Archie Duckworth Bridge over the Nottawasaga River, located on Centre Street, 0.15 km east of Huron Street in the community of Angus, Township of Essa.

Construction is slated to commence in September 2022 and is expected to continue until late November 2022. Centre Street will be limited to a single bidirectional lane over the bridge using portable temporary traffic signals. The lanes will be narrower and shifted from their current path. However, one traffic lane (two-way traffic) and one pedestrian pathway/sidewalk will remain open at all times during construction. Some
traffic delays may be experienced during construction, and we ask for your patience and cooperation during this time.

For full details please see the Simcoe County Memorandum.

Scroll to top