Notice of Road Construction - Road Closures

20th Sideroad Between The 9th Line and the 10th Line

Estimated closure duration: July 27th, 2026, to July 31st, 2026

The Township is advising residents of a road closure on the 20th Sideroad, between the 9th line and the 10th line due to a culvert replacement.

Local traffic will be permitted between the 9th Line and the 10th Line, however no through traffic will be allowed during construction.

While every effort will be made to minimize disruptions, residents and motorists should expect temporary inconveniences, including traffic delays, signed detours, construction noise, construction equipment and dust. Please refer to the attached project location maps for additional information.

Should you have any questions or concerns related to this project, please contact either of the following representatives:

Township of Essa
Sara Rear, C.E.T.
Engineering Coordinator 
srear@essatownship.on.ca 
705-424-9917 ext. 103
Township of Essa
Jeremy Walton, C. Tech
GIS/Survey Technician
jwalton@essatownship.on.ca 
705-424-9917 ext. 136
Scroll to top