The Township of Essa hereby advises that Maplewood Park Drive will be closed to allow for the:

Maplewood Park Construction

The closure will begin: July 3rd, 2024.

The road is expected to reopen July 12th, 2024.

Although every effort will be made to limit the amount of disturbance to the residents / merchants, some inconveniences such as impeded traffic flows and access to driveways / merchants are to be expected.  

The scope of work includes the following:

  • Site Servicing including water, sanitary sewer, storm sewer and electrical services.
  • Temporary connections completed within the ROW.
  • Road restoration in the affected areas.

What does this mean for the residents?

  • The roadway will be closed to regular traffic and only local traffic/emergency traffic will have access along Maplewood Drive between Gold Park Gate and Sasco Way.

Safety:

  • Please stay clear from all construction areas and avoid entering the construction zone.
  • Do not park in/near the area of the construction.
  • We will work with all parties involved to continue to respect our neighbors throughout the construction operations.

Should you have any questions or concerns related to this project, please do not hesitate to contact either of the following representatives: 

Contractor Contact (Main)

Phone

E-mail

Lucas Powlesland

647-280-0922

lucas@powcon.ca

Township Engineer Contact:

 

 

Eric Persichini

705-351-3053

epersichini@grnland.com

Township Contact:

 

 

Chris Rankin

705-424-9917 x141

crankin@essatownship.on.ca   

John Kolb

Rachele Brown

705 424-9917 ext. 112

705-424-9917 ext. 132

jkolb@essatownship.on.ca

rbrown@essatownship.on.ca

 ROAD CLOSURE LOCATION

The following areas will be affected by the road closure along Maplewood Drive:


Figure 1 – Local traffic only in the highlighted area along Maplewood Drive.

Scroll to top